Match the tablet to the system
Water-treatment procurement should begin with the system type and performance requirements. Tablet dimensions, purity, dissolution expectations, operating conditions, and required volume should be included before product availability is confirmed.
- Water softener or treatment-system type
- Tablet dimensions and performance requirements
- Purity and handling requirements
- Expected volume and delivery schedule

